power plant at sea side

Future-ready decarbonization

The power generation industry is changing fast. With fluctuating fuel prices, ever-stricter regulations, and advancements in new energy-efficient technologies, it is crucial you explore every opportunity to balance cost, compliance, and sustainability.

Our gas conversion solutions can help you to maximize competitiveness and build a greener profile by capitalizing on optimal fuel prices and lowering emissions. As the original designers of your engines, we are uniquely placed to support you through the entire process, with the expertise and hardware ready now to ensure the best, and fastest results.

Quote
The world is changing, and power businesses have to adapt to stay competitive. Gas conversions offer stability in an uncertain future.  

Bernd Siebert, Head of Retrofit & Upgrades, Everllence PrimeServ Germany

Reliable and flexible energy with power plant gas conversion

For decades, Everllence engines have been the backbone of the power industry. Today, we help our customers meet new demands with power plant gas conversion solutions that reduce emissions, lower fuel costs, and deliver flexibility—powered by our experience as the original engine designer.

service employee in front of a plant

Engineered for efficiency. Ready for tomorrow

Power generation plant operators are facing an increasingly uncertain environment, where fluctuating fuel prices and rapidly evolving emissions regulation are driving the need for change. With Everllence PrimeServ’s gas conversion solutions, you get greater control and flexibility over your fuel strategy. Not only does this allow you to take advantage of the relatively low cost of gas, but its superior environmental benefits help your business to stay compliant with all new and upcoming emissions limitations. As the original designer of your engines, you can trust Everllence PrimeServ to deliver the reliability, efficiency, and performance your business needs to stay competitive and compliant, whatever the future holds.

The future runs on dual-fuel

We provide a complete gas conversion package for power applications, including:

  • Research and development
  • Engineering
  • Site survey
  • Engine hardware
  • Fuel supply system
  • Installation and supervision
  • Testing and commissioning
  • Project management

 

 

 

 

 

 

 

    service employee inspecting some pipes
    Graphic on gas conversion timeline

    Gas conversion timeline for power applications 

    With extensive experience in power plant gas conversion, Everllence PrimeServ supports you through every stage of the process.

    1. Contract signature
    2. Production process (12-14 months)
    3. Retrofit engineering
    4. Manufacturing
    5. Shipment
    6. Launch (30-60 days)
    7. Installation
    8. Commissioning, test & trials
    9. Handover

    Contact our experts

    Ready to convert?

    If you are looking for the best partner for your power plant gas conversion project, you have come to the right place. As the original designers, we have a better understanding of your engines than anyone else, with the expertise and next-gen hardware ready now to fuel your journey towards decarbonization.

    Talk to our experts

    Service employee with helmet and tablet