Fast, full-service turnarounds

A fast, comprehensive fluid catalytic cracking (FCC) turnaround helps you avoid significant revenue losses from a refinery which is out of operation, but only if you can trust the quality and reliability of the work. We have a proven safety record and have been trusted by major refineries since 1980. Contact us for full-service solutions with short downtimes – including everything from planning and manufacturing to on-site execution. It’s our mission.

Download our reference paper

Facts

Good to know

Proven reliability
130
turnarounds
Our capacity and experience are proven worldwide.
Extensive experience
45
years
Minimizing downtime for the world's leading refineries.
Punctuality
100
%
On-time delivery record.
Worldwide cover
57
countries
Managing every challenge – from Abu Dhabi to Vietnam.

Everllence Turnaround services 

Benefit from our long-term approach and decades of experience

With decades of hands-on experience and over 130 successful refinery turnarounds, Everlance delivers fully integrated solutions that ensure safe, reliable, and efficient project execution — even under the most demanding conditions. Our end-to-end approach covers everything from planning and in-house manufacturing to on-site delivery, minimizing downtime and maximizing safety, compliance, and accountability.

  • Complete service from one provider
  • Unified project timeline & single-source accountability
  • Shortest possible downtimes
  • Optimized resource allocation
  • Excellent safety standards
  • In-house manufacturing expertise

 

Simplified 3D diagram showing two connected process vessels and support structure

Download reference paper

Proven FCC turnaround success stories

Examine two of our recent projects and see how we work to reduce downtime and ensure FCC units continue to operate efficiency, safety, and in compliance with regulations. 

Download reference paper

Quote
Your team did a great job in spring 2024 during our FCC TAR. And it’s good to share that – after all the hard work – the unit performs well.  

Henk Zorge, Turnaround project lead, Shell

Endesa Power plant at night

Reference case

Shell in Pernis (Rotterdam), 2024

Shell’s refinery in Pernis required a new FCC reactor. Everllence delivered a complete solution – covering planning, manufacturing, and on-site assembly – within the specified timeframe. The reactor measured 30 meters in length, 8 meters in diameter, and weighed 438 metric tons. Planning began in October 2022, and the on-site phase was completed by March 2024. The shutdown lasted just 42 days. In addition to replacing the reactor, we also performed general repair work.

Learn more

Reference case

Mineraloelraffinerie Oberrhein (MiRO) in Karlsruhe, 2021

MiRO is Germany’s largest and most advanced refinery. In 2021, the FCC unit required inspection and repair work. We replaced the cyclone system to change the yield structure and improve margins. Despite the challenges posed by the Covid-19 pandemic, the turnaround was completed on schedule. The shutdown lasted just 38 days. To save time, we preassembled the cyclone system into a complete upper section and shipped it by sea from Deggendorf to Karlsruhe.

Learn more

Everllence office in Copenhagen arial shot
Two industrial technicians in safety gear operating machinery in a manufacturing environment

Start with the experts

For the shortest downtimes and minimum risk

Does your FCC unit require a turnaround? A planned shutdown for maintenance and repairs can ensure the safe and reliable operation of your refinery, helping you comply with regulations, and extending the lifespan of critical equipment.

Contact us